---
title: How Screen Time Impacts Children’s Sleep
description: Discover how evening screen time affects your child's sleep and learn effective strategies to improve their bedtime routine for better rest and overall health.
image: https://info.ancsleep.com/hubfs/Canva%20images/Canva%20Design%20DAGweRAIZRI.png
---

[![anchorage_sleep-center-logo.png](https://info.ancsleep.com/hs-fs/hubfs/AnchorageSleepCenter_Jan2017/Layout/anchorage_sleep-center-logo.png?width=345&height=85&name=anchorage_sleep-center-logo.png "anchorage_sleep-center-logo.png")](http://ancsleep.com/)

- PH: (907) 743-0050 | E: info@ancsleep.com | 510 W. Tudor Rd., Ste 5

- [**](https://www.facebook.com/pages/Anchorage-Sleep-Center/175458735805829)
- [**](https://twitter.com/AnchorageSleep)
- [**](https://plus.google.com/100144074637247698701/about)

[![anchorage_sleep-center-logo.png](https://info.ancsleep.com/hs-fs/hubfs/AnchorageSleepCenter_Jan2017/Layout/anchorage_sleep-center-logo.png?width=345&height=85&name=anchorage_sleep-center-logo.png "anchorage_sleep-center-logo.png")](http://ancsleep.com/)

# ANCSLEEP BLOG

# How Screen Time Impacts Children’s Sleep

Posted by [Darian Dozier](https://info.ancsleep.com/blog/author/darian-dozier) on Sep 19, 2025 8:00:00 AM

- [Tweet](https://twitter.com/share)

![Canva Design DAGweRAIZRI](https://info.ancsleep.com/hs-fs/hubfs/Canva%20images/Canva%20Design%20DAGweRAIZRI.png?width=2240&height=1260&name=Canva%20Design%20DAGweRAIZRI.png)

In today’s digital world, screens are everywhere—phones, tablets, computers, TVs, and even classroom technology. While these tools can be educational and entertaining, parents often wonder how screen time affects children’s sleep. Research shows that too much screen exposure, especially close to bedtime, can interfere with the quality and quantity of children’s rest.

****

## Why Sleep Matters for Kids

Sleep is essential for a child’s growth, learning, emotional regulation, and overall health. Younger children need between [9 and 14 hours of sleep per day](https://info.ancsleep.com/blog/how-much-sleep-do-children-need)**,** depending on their age. When kids don’t get enough quality rest, they may struggle with attention, mood, behavior, and academic performance.

## How Screen Time Interferes with Sleep

### 1. **Blue Light Exposure**

Screens emit [blue light](https://info.ancsleep.com/blog/the-effect-of-blue-light-on-sleep), which can disrupt the body’s natural production of melatonin, the hormone that signals it’s time to sleep. When kids are exposed to screens in the evening, their brains may stay alert longer, delaying bedtime and reducing total sleep hours.

### 2. **Overstimulation**

Interactive games, videos, and social media can be exciting and engaging. But too much stimulation before bed makes it harder for children to wind down, leading to difficulty falling asleep.

### 3. **Sleep Schedule Disruptions**

Excessive screen time often pushes bedtime later, especially if kids are watching TV, scrolling, or gaming into the evening. Over time, this can shift their sleep schedule and create ongoing sleep debt.

### 4. **Reduced Sleep Quality**

Even when kids fall asleep after screen use, their sleep may be lighter and less restorative. Some studies suggest that late-night screen exposure is linked to more nighttime awakenings and restless sleep.

## How Parents Can Help

The good news is that parents and caregivers can take steps to protect children’s sleep without banning screens entirely. Here are some strategies:

- **Create a digital curfew**: Turn off devices at least **1 hour before bedtime**.
- **Set screen-free zones**: Keep bedrooms device-free to encourage restful sleep.
- **Encourage calming routines**: Replace screen time with reading, storytelling, or quiet play before bed.
- **Model healthy habits**: Children are more likely to follow rules when they see adults practicing them too.
- **Prioritize daytime use**: Encourage educational or entertainment screen use earlier in the day instead of right before sleep.

## Conclusion 

Screens are a normal part of modern childhood, but when it comes to sleep, balance is key. Too much evening screen time can delay bedtime, reduce sleep quality, and leave kids feeling tired and irritable the next day. By setting boundaries and creating healthy nighttime routines, parents can help their children enjoy technology while still getting the rest they need to grow and thrive.

 

If you or someone you know struggles with sleep, please click the orange button below to take a free online sleep test and talk with one of our sleep health professionals. 

[![Take a Free Online Sleep Test](https://no-cache.hubspot.com/cta/default/2589155/7aac5edb-65b7-4bef-a8f3-925ec898aff1.png)](https://cta-redirect.hubspot.com/cta/redirect/2589155/7aac5edb-65b7-4bef-a8f3-925ec898aff1)

 

 Topics: [kids and sleep](https://info.ancsleep.com/blog/topic/kids-and-sleep), [blue light and sleep](https://info.ancsleep.com/blog/topic/blue-light-and-sleep), [screen time and sleep](https://info.ancsleep.com/blog/topic/screen-time-and-sleep)

### Subscribe to Email Updates

### Recent Posts

### Posts by Topic

- [Sleep Deprivation (90)](https://info.ancsleep.com/blog/topic/sleep-deprivation)
- [Sleep and children (65)](https://info.ancsleep.com/blog/topic/sleep-and-children)
- [Sleeping Environment (64)](https://info.ancsleep.com/blog/topic/sleeping-environment)
- [Insomnia (61)](https://info.ancsleep.com/blog/topic/insomnia)
- [Sleep Apnea (59)](https://info.ancsleep.com/blog/topic/sleep-apnea)
- [Better Sleep (45)](https://info.ancsleep.com/blog/topic/better-sleep)
- [Obstructive Sleep Apnea (43)](https://info.ancsleep.com/blog/topic/obstructive-sleep-apnea)
- [OSA (42)](https://info.ancsleep.com/blog/topic/osa)
- [sleep hygiene (41)](https://info.ancsleep.com/blog/topic/sleep-hygiene)
- [Sleep environment (37)](https://info.ancsleep.com/blog/topic/sleep-environment)
- [sleep health (36)](https://info.ancsleep.com/blog/topic/sleep-health)
- [Sleep Disorders (35)](https://info.ancsleep.com/blog/topic/sleep-disorders)
- [Baby sleep (32)](https://info.ancsleep.com/blog/topic/baby-sleep)
- [CPAP (31)](https://info.ancsleep.com/blog/topic/cpap)
- [Health (28)](https://info.ancsleep.com/blog/topic/health)
- [Sleep routine (28)](https://info.ancsleep.com/blog/topic/sleep-routine)
- [Sleep and Brain (21)](https://info.ancsleep.com/blog/topic/sleep-and-brain)
- [mental health (21)](https://info.ancsleep.com/blog/topic/mental-health)
- [Pain and Sleep (20)](https://info.ancsleep.com/blog/topic/pain-and-sleep)
- [exercise (20)](https://info.ancsleep.com/blog/topic/exercise)
- [Chronic fatigue (19)](https://info.ancsleep.com/blog/topic/chronic-fatigue)
- [Travel (18)](https://info.ancsleep.com/blog/topic/travel)
- [sleep quality (18)](https://info.ancsleep.com/blog/topic/sleep-quality)
- [teens and sleep (18)](https://info.ancsleep.com/blog/topic/teens-and-sleep)
- [Restless leg syndrome (17)](https://info.ancsleep.com/blog/topic/restless-leg-syndrome)
- [Snoring (17)](https://info.ancsleep.com/blog/topic/snoring)
- [Circadian Rhythm (16)](https://info.ancsleep.com/blog/topic/circadian-rhythm)
- [Food and Sleep (16)](https://info.ancsleep.com/blog/topic/food-and-sleep)
- [Weight and Sleep (16)](https://info.ancsleep.com/blog/topic/weight-and-sleep)
- [sleep study (16)](https://info.ancsleep.com/blog/topic/sleep-study)
- [Stress and Sleep (15)](https://info.ancsleep.com/blog/topic/stress-and-sleep)
- [Hormones and Sleep (14)](https://info.ancsleep.com/blog/topic/hormones-and-sleep)
- [Aging and Sleep (13)](https://info.ancsleep.com/blog/topic/aging-and-sleep)
- [Fatigue (13)](https://info.ancsleep.com/blog/topic/fatigue)
- [Shift work (13)](https://info.ancsleep.com/blog/topic/shift-work)
- [infant sleep (13)](https://info.ancsleep.com/blog/topic/infant-sleep)
- [babysleep (12)](https://info.ancsleep.com/blog/topic/babysleep)
- [Alaska Sleep Challanges (11)](https://info.ancsleep.com/blog/topic/alaska-sleep-challanges)
- [Childhood insomnia (11)](https://info.ancsleep.com/blog/topic/childhood-insomnia)
- [Pregnancy (11)](https://info.ancsleep.com/blog/topic/pregnancy)
- [Sleep (11)](https://info.ancsleep.com/blog/topic/sleep)
- [elderly sleep (11)](https://info.ancsleep.com/blog/topic/elderly-sleep)
- [kids (11)](https://info.ancsleep.com/blog/topic/kids)
- [medication (11)](https://info.ancsleep.com/blog/topic/medication)
- [melatonin (11)](https://info.ancsleep.com/blog/topic/melatonin)
- [couples sleep (10)](https://info.ancsleep.com/blog/topic/couples-sleep)
- [nutrition (10)](https://info.ancsleep.com/blog/topic/nutrition)
- [ADHD (9)](https://info.ancsleep.com/blog/topic/adhd)
- [Depression (9)](https://info.ancsleep.com/blog/topic/depression)
- [Diabetes (9)](https://info.ancsleep.com/blog/topic/diabetes)
- [Sleep and Age (9)](https://info.ancsleep.com/blog/topic/sleep-and-age)
- [Technology (9)](https://info.ancsleep.com/blog/topic/technology)
- [Well-Being (9)](https://info.ancsleep.com/blog/topic/well-being)
- [dreams (9)](https://info.ancsleep.com/blog/topic/dreams)
- [meditation (9)](https://info.ancsleep.com/blog/topic/meditation)
- [Alaskan Sleep Challenges (8)](https://info.ancsleep.com/blog/topic/alaskan-sleep-challenges)
- [Nightmare (8)](https://info.ancsleep.com/blog/topic/nightmare)
- [Nocturia (8)](https://info.ancsleep.com/blog/topic/nocturia)
- [Sleep debt (8)](https://info.ancsleep.com/blog/topic/sleep-debt)
- [alcohol (8)](https://info.ancsleep.com/blog/topic/alcohol)
- [anxiety (8)](https://info.ancsleep.com/blog/topic/anxiety)
- [blue light (8)](https://info.ancsleep.com/blog/topic/blue-light)
- [blue light and sleep (8)](https://info.ancsleep.com/blog/topic/blue-light-and-sleep)
- [caffeine (8)](https://info.ancsleep.com/blog/topic/caffeine)
- [heartdisease (8)](https://info.ancsleep.com/blog/topic/heartdisease)
- [kids and sleep (8)](https://info.ancsleep.com/blog/topic/kids-and-sleep)
- [relaxation (8)](https://info.ancsleep.com/blog/topic/relaxation)
- [womens health (8)](https://info.ancsleep.com/blog/topic/womens-health)
- [GERD (7)](https://info.ancsleep.com/blog/topic/gerd)
- [Immune System and Sleep (7)](https://info.ancsleep.com/blog/topic/immune-system-and-sleep)
- [Narcolepsy (7)](https://info.ancsleep.com/blog/topic/narcolepsy)
- [Sexual Health (7)](https://info.ancsleep.com/blog/topic/sexual-health)
- [Sleep and relationships (7)](https://info.ancsleep.com/blog/topic/sleep-and-relationships)
- [Tips (7)](https://info.ancsleep.com/blog/topic/tips)
- [caffeine and sleep (7)](https://info.ancsleep.com/blog/topic/caffeine-and-sleep)
- [diet and sleep (7)](https://info.ancsleep.com/blog/topic/diet-and-sleep)
- [fragmented sleep (7)](https://info.ancsleep.com/blog/topic/fragmented-sleep)
- [injury (7)](https://info.ancsleep.com/blog/topic/injury)
- [nap (7)](https://info.ancsleep.com/blog/topic/nap)
- [pregnancy and sleep (7)](https://info.ancsleep.com/blog/topic/pregnancy-and-sleep)
- [sleep aids (7)](https://info.ancsleep.com/blog/topic/sleep-aids)
- [Sleep Medicine (6)](https://info.ancsleep.com/blog/topic/sleep-medicine)
- [morning routine (6)](https://info.ancsleep.com/blog/topic/morning-routine)
- [neurotransmitters and sleep (6)](https://info.ancsleep.com/blog/topic/neurotransmitters-and-sleep)
- [safe sleep (6)](https://info.ancsleep.com/blog/topic/safe-sleep)
- [smoking (6)](https://info.ancsleep.com/blog/topic/smoking)
- [COPD (5)](https://info.ancsleep.com/blog/topic/copd)
- [CPAP cleaning (5)](https://info.ancsleep.com/blog/topic/cpap-cleaning)
- [Food (5)](https://info.ancsleep.com/blog/topic/food)
- [Seasonal Sleep Disorders (5)](https://info.ancsleep.com/blog/topic/seasonal-sleep-disorders)
- [Sleep Diary (5)](https://info.ancsleep.com/blog/topic/sleep-diary)
- [Sleep Studies (5)](https://info.ancsleep.com/blog/topic/sleep-studies)
- [adolescent sleep (5)](https://info.ancsleep.com/blog/topic/adolescent-sleep)
- [allergies (5)](https://info.ancsleep.com/blog/topic/allergies)
- [drowsy driving (5)](https://info.ancsleep.com/blog/topic/drowsy-driving)
- [excessivedaytimesleepiness (5)](https://info.ancsleep.com/blog/topic/excessivedaytimesleepiness)
- [headache and sleep (5)](https://info.ancsleep.com/blog/topic/headache-and-sleep)
- [learning (5)](https://info.ancsleep.com/blog/topic/learning)
- [mattress and sleep (5)](https://info.ancsleep.com/blog/topic/mattress-and-sleep)
- [obesity (5)](https://info.ancsleep.com/blog/topic/obesity)
- [relaxation and sleep (5)](https://info.ancsleep.com/blog/topic/relaxation-and-sleep)
- [skin and sleep (5)](https://info.ancsleep.com/blog/topic/skin-and-sleep)
- [sleep stages (5)](https://info.ancsleep.com/blog/topic/sleep-stages)
- [COVID19 (4)](https://info.ancsleep.com/blog/topic/covid19)
- [Daylight Savings (4)](https://info.ancsleep.com/blog/topic/daylight-savings)
- [Night Terror (4)](https://info.ancsleep.com/blog/topic/night-terror)
- [Parasomnias (4)](https://info.ancsleep.com/blog/topic/parasomnias)
- [Pregnancy and sleep apnea (4)](https://info.ancsleep.com/blog/topic/pregnancy-and-sleep-apnea)
- [REM Sleep Disorders (4)](https://info.ancsleep.com/blog/topic/rem-sleep-disorders)
- [Sleep Paralysis (4)](https://info.ancsleep.com/blog/topic/sleep-paralysis)
- [Students (4)](https://info.ancsleep.com/blog/topic/students)
- [alcohol and sleep (4)](https://info.ancsleep.com/blog/topic/alcohol-and-sleep)
- [chronotype (4)](https://info.ancsleep.com/blog/topic/chronotype)
- [couple sleep (4)](https://info.ancsleep.com/blog/topic/couple-sleep)
- [deep sleep (4)](https://info.ancsleep.com/blog/topic/deep-sleep)
- [depression and sleep (4)](https://info.ancsleep.com/blog/topic/depression-and-sleep)
- [diet (4)](https://info.ancsleep.com/blog/topic/diet)
- [electronics (4)](https://info.ancsleep.com/blog/topic/electronics)
- [energy (4)](https://info.ancsleep.com/blog/topic/energy)
- [gender and sleep (4)](https://info.ancsleep.com/blog/topic/gender-and-sleep)
- [heart health (4)](https://info.ancsleep.com/blog/topic/heart-health)
- [mattress (4)](https://info.ancsleep.com/blog/topic/mattress)
- [memory (4)](https://info.ancsleep.com/blog/topic/memory)
- [sleep and exectuive functioning (4)](https://info.ancsleep.com/blog/topic/sleep-and-exectuive-functioning)
- [sleep tracking (4)](https://info.ancsleep.com/blog/topic/sleep-tracking)
- [technology and sleep (4)](https://info.ancsleep.com/blog/topic/technology-and-sleep)
- [work and sleep (4)](https://info.ancsleep.com/blog/topic/work-and-sleep)
- [Insulin (3)](https://info.ancsleep.com/blog/topic/insulin)
- [Lifestyle and Sleep (3)](https://info.ancsleep.com/blog/topic/lifestyle-and-sleep)
- [Sleep Myths (3)](https://info.ancsleep.com/blog/topic/sleep-myths)
- [Sleep Tips (3)](https://info.ancsleep.com/blog/topic/sleep-tips)
- [Sleep and Physical Health (3)](https://info.ancsleep.com/blog/topic/sleep-and-physical-health)
- [allergies and sleep (3)](https://info.ancsleep.com/blog/topic/allergies-and-sleep)
- [anxiety and sleep (3)](https://info.ancsleep.com/blog/topic/anxiety-and-sleep)
- [asthma (3)](https://info.ancsleep.com/blog/topic/asthma)
- [athletes sleep (3)](https://info.ancsleep.com/blog/topic/athletes-sleep)
- [bedroom and sleep (3)](https://info.ancsleep.com/blog/topic/bedroom-and-sleep)
- [bedwetting (3)](https://info.ancsleep.com/blog/topic/bedwetting)
- [cancer (3)](https://info.ancsleep.com/blog/topic/cancer)
- [chronic illness and sleep (3)](https://info.ancsleep.com/blog/topic/chronic-illness-and-sleep)
- [dementia (3)](https://info.ancsleep.com/blog/topic/dementia)
- [digestion (3)](https://info.ancsleep.com/blog/topic/digestion)
- [dry mouth (3)](https://info.ancsleep.com/blog/topic/dry-mouth)
- [heart disease (3)](https://info.ancsleep.com/blog/topic/heart-disease)
- [hydration (3)](https://info.ancsleep.com/blog/topic/hydration)
- [jetlag (3)](https://info.ancsleep.com/blog/topic/jetlag)
- [lung health (3)](https://info.ancsleep.com/blog/topic/lung-health)
- [memory and sleep (3)](https://info.ancsleep.com/blog/topic/memory-and-sleep)
- [men and sleep (3)](https://info.ancsleep.com/blog/topic/men-and-sleep)
- [menopause and sleep (3)](https://info.ancsleep.com/blog/topic/menopause-and-sleep)
- [migraines and sleep (3)](https://info.ancsleep.com/blog/topic/migraines-and-sleep)
- [newborn sleep (3)](https://info.ancsleep.com/blog/topic/newborn-sleep)
- [nicotine and sleep (3)](https://info.ancsleep.com/blog/topic/nicotine-and-sleep)
- [night sweats (3)](https://info.ancsleep.com/blog/topic/night-sweats)
- [parkinsons (3)](https://info.ancsleep.com/blog/topic/parkinsons)
- [perimenopause and sleep (3)](https://info.ancsleep.com/blog/topic/perimenopause-and-sleep)
- [relaxation techniques for sleep (3)](https://info.ancsleep.com/blog/topic/relaxation-techniques-for-sleep)
- [rem sleep (3)](https://info.ancsleep.com/blog/topic/rem-sleep)
- [room hygiene (3)](https://info.ancsleep.com/blog/topic/room-hygiene)
- [seizures and sleep (3)](https://info.ancsleep.com/blog/topic/seizures-and-sleep)
- [sleep and exercise (3)](https://info.ancsleep.com/blog/topic/sleep-and-exercise)
- [sleep and pregnancy (3)](https://info.ancsleep.com/blog/topic/sleep-and-pregnancy)
- [substance abuse (3)](https://info.ancsleep.com/blog/topic/substance-abuse)
- [sunlight (3)](https://info.ancsleep.com/blog/topic/sunlight)
- [swaddling and sleep (3)](https://info.ancsleep.com/blog/topic/swaddling-and-sleep)
- [tobacco (3)](https://info.ancsleep.com/blog/topic/tobacco)
- [travel and sleep (3)](https://info.ancsleep.com/blog/topic/travel-and-sleep)
- [vitamins and sleep (3)](https://info.ancsleep.com/blog/topic/vitamins-and-sleep)
- [Congestion (2)](https://info.ancsleep.com/blog/topic/congestion)
- [Dangers of not Sleeping (2)](https://info.ancsleep.com/blog/topic/dangers-of-not-sleeping)
- [Heartburn (2)](https://info.ancsleep.com/blog/topic/heartburn)
- [IBD (2)](https://info.ancsleep.com/blog/topic/ibd)
- [Isomnia (2)](https://info.ancsleep.com/blog/topic/isomnia)
- [PCOS and Sleep (2)](https://info.ancsleep.com/blog/topic/pcos-and-sleep)
- [Sleep Attacks (2)](https://info.ancsleep.com/blog/topic/sleep-attacks)
- [Sleep Techniques (2)](https://info.ancsleep.com/blog/topic/sleep-techniques)
- [Stroke (2)](https://info.ancsleep.com/blog/topic/stroke)
- [Testosterone (2)](https://info.ancsleep.com/blog/topic/testosterone)
- [Yoga (2)](https://info.ancsleep.com/blog/topic/yoga)
- [air quality (2)](https://info.ancsleep.com/blog/topic/air-quality)
- [anemia (2)](https://info.ancsleep.com/blog/topic/anemia)
- [athlete (2)](https://info.ancsleep.com/blog/topic/athlete)
- [autism (2)](https://info.ancsleep.com/blog/topic/autism)
- [autoimmune and sleep (2)](https://info.ancsleep.com/blog/topic/autoimmune-and-sleep)
- [beauty (2)](https://info.ancsleep.com/blog/topic/beauty)
- [bedtime procrastination (2)](https://info.ancsleep.com/blog/topic/bedtime-procrastination)
- [behavior and sleep (2)](https://info.ancsleep.com/blog/topic/behavior-and-sleep)
- [brain fog (2)](https://info.ancsleep.com/blog/topic/brain-fog)
- [bruxism and sleep (2)](https://info.ancsleep.com/blog/topic/bruxism-and-sleep)
- [central sleep apnea (2)](https://info.ancsleep.com/blog/topic/central-sleep-apnea)
- [cognition and sleep (2)](https://info.ancsleep.com/blog/topic/cognition-and-sleep)
- [cold (2)](https://info.ancsleep.com/blog/topic/cold)
- [cold plunges and sleep (2)](https://info.ancsleep.com/blog/topic/cold-plunges-and-sleep)
- [concentration (2)](https://info.ancsleep.com/blog/topic/concentration)
- [diabetes and sleep (2)](https://info.ancsleep.com/blog/topic/diabetes-and-sleep)
- [fertility and sleep (2)](https://info.ancsleep.com/blog/topic/fertility-and-sleep)
- [headache (2)](https://info.ancsleep.com/blog/topic/headache)
- [hypersomnia (2)](https://info.ancsleep.com/blog/topic/hypersomnia)
- [light (2)](https://info.ancsleep.com/blog/topic/light)
- [meditation and sleep (2)](https://info.ancsleep.com/blog/topic/meditation-and-sleep)
- [menstrual cycle and sleep (2)](https://info.ancsleep.com/blog/topic/menstrual-cycle-and-sleep)
- [mental health and sleep (2)](https://info.ancsleep.com/blog/topic/mental-health-and-sleep)
- [mouth breathing (2)](https://info.ancsleep.com/blog/topic/mouth-breathing)
- [natural sleep remedies (2)](https://info.ancsleep.com/blog/topic/natural-sleep-remedies)
- [night shift (2)](https://info.ancsleep.com/blog/topic/night-shift)
- [nighttime urination (2)](https://info.ancsleep.com/blog/topic/nighttime-urination)
- [nocturnal enuresis (2)](https://info.ancsleep.com/blog/topic/nocturnal-enuresis)
- [nrem (2)](https://info.ancsleep.com/blog/topic/nrem)
- [obesity and sleep (2)](https://info.ancsleep.com/blog/topic/obesity-and-sleep)
- [oversleeping (2)](https://info.ancsleep.com/blog/topic/oversleeping)
- [pajamas (2)](https://info.ancsleep.com/blog/topic/pajamas)
- [partner sleep (2)](https://info.ancsleep.com/blog/topic/partner-sleep)
- [ptsd (2)](https://info.ancsleep.com/blog/topic/ptsd)
- [ptsd and sleep (2)](https://info.ancsleep.com/blog/topic/ptsd-and-sleep)
- [restorative sleep (2)](https://info.ancsleep.com/blog/topic/restorative-sleep)
- [roommate sleep (2)](https://info.ancsleep.com/blog/topic/roommate-sleep)
- [screen time and sleep (2)](https://info.ancsleep.com/blog/topic/screen-time-and-sleep)
- [seizure (2)](https://info.ancsleep.com/blog/topic/seizure)
- [sleep and emotion (2)](https://info.ancsleep.com/blog/topic/sleep-and-emotion)
- [sleep habits (2)](https://info.ancsleep.com/blog/topic/sleep-habits)
- [sleep latency (2)](https://info.ancsleep.com/blog/topic/sleep-latency)
- [sleep therapy (2)](https://info.ancsleep.com/blog/topic/sleep-therapy)
- [sleepiness (2)](https://info.ancsleep.com/blog/topic/sleepiness)
- [sleeping fabrics (2)](https://info.ancsleep.com/blog/topic/sleeping-fabrics)
- [smart beds (2)](https://info.ancsleep.com/blog/topic/smart-beds)
- [social jet lag (2)](https://info.ancsleep.com/blog/topic/social-jet-lag)
- [social media (2)](https://info.ancsleep.com/blog/topic/social-media)
- [stroke and sleep (2)](https://info.ancsleep.com/blog/topic/stroke-and-sleep)
- [testosterone and sleep (2)](https://info.ancsleep.com/blog/topic/testosterone-and-sleep)
- [thyroid (2)](https://info.ancsleep.com/blog/topic/thyroid)
- [vitamin deficiency and sleep (2)](https://info.ancsleep.com/blog/topic/vitamin-deficiency-and-sleep)
- [weight loss and sleep (2)](https://info.ancsleep.com/blog/topic/weight-loss-and-sleep)
- [womens sleep (2)](https://info.ancsleep.com/blog/topic/womens-sleep)
- [Academics and sleep (1)](https://info.ancsleep.com/blog/topic/academics-and-sleep)
- [CKD (1)](https://info.ancsleep.com/blog/topic/ckd)
- [Cleaning (1)](https://info.ancsleep.com/blog/topic/cleaning)
- [Cortisol (1)](https://info.ancsleep.com/blog/topic/cortisol)
- [Crohn's Disease (1)](https://info.ancsleep.com/blog/topic/crohns-disease)
- [Dementia and sleep (1)](https://info.ancsleep.com/blog/topic/dementia-and-sleep)
- [Kidney disease (1)](https://info.ancsleep.com/blog/topic/kidney-disease)
- [Neuropathy (1)](https://info.ancsleep.com/blog/topic/neuropathy)
- [New Puppy (1)](https://info.ancsleep.com/blog/topic/new-puppy)
- [Peripheral neuropathy (1)](https://info.ancsleep.com/blog/topic/peripheral-neuropathy)
- [Pulmonology (1)](https://info.ancsleep.com/blog/topic/pulmonology)
- [RLS (1)](https://info.ancsleep.com/blog/topic/rls)
- [Reflux (1)](https://info.ancsleep.com/blog/topic/reflux)
- [SRPE (1)](https://info.ancsleep.com/blog/topic/srpe)
- [Sleep Talking (1)](https://info.ancsleep.com/blog/topic/sleep-talking)
- [Sleep and Eyesight (1)](https://info.ancsleep.com/blog/topic/sleep-and-eyesight)
- [Sleep related painful erections (1)](https://info.ancsleep.com/blog/topic/sleep-related-painful-erections)
- [Ulcerative Colitis (1)](https://info.ancsleep.com/blog/topic/ulcerative-colitis)
- [acid reflux (1)](https://info.ancsleep.com/blog/topic/acid-reflux)
- [addiction and sleep (1)](https://info.ancsleep.com/blog/topic/addiction-and-sleep)
- [adjustable beds (1)](https://info.ancsleep.com/blog/topic/adjustable-beds)
- [ai and sleep (1)](https://info.ancsleep.com/blog/topic/ai-and-sleep)
- [all nighter (1)](https://info.ancsleep.com/blog/topic/all-nighter)
- [altitude (1)](https://info.ancsleep.com/blog/topic/altitude)
- [alzheimers and sleep (1)](https://info.ancsleep.com/blog/topic/alzheimers-and-sleep)
- [anemia and fatigue (1)](https://info.ancsleep.com/blog/topic/anemia-and-fatigue)
- [antioxidants (1)](https://info.ancsleep.com/blog/topic/antioxidants)
- [antipsychotics (1)](https://info.ancsleep.com/blog/topic/antipsychotics)
- [aromatherapy and sleep (1)](https://info.ancsleep.com/blog/topic/aromatherapy-and-sleep)
- [arthritis and sleep (1)](https://info.ancsleep.com/blog/topic/arthritis-and-sleep)
- [artificial intelligence and sleep (1)](https://info.ancsleep.com/blog/topic/artificial-intelligence-and-sleep)
- [autism and sleep (1)](https://info.ancsleep.com/blog/topic/autism-and-sleep)
- [back pain (1)](https://info.ancsleep.com/blog/topic/back-pain)
- [back pain and sleep (1)](https://info.ancsleep.com/blog/topic/back-pain-and-sleep)
- [bipap (1)](https://info.ancsleep.com/blog/topic/bipap)
- [bipolar disorder and sleep (1)](https://info.ancsleep.com/blog/topic/bipolar-disorder-and-sleep)
- [breastfeeding and sleep (1)](https://info.ancsleep.com/blog/topic/breastfeeding-and-sleep)
- [burnout (1)](https://info.ancsleep.com/blog/topic/burnout)
- [caffeine withdrawal (1)](https://info.ancsleep.com/blog/topic/caffeine-withdrawal)
- [cbti (1)](https://info.ancsleep.com/blog/topic/cbti)
- [cerebral palsy and sleep (1)](https://info.ancsleep.com/blog/topic/cerebral-palsy-and-sleep)
- [chronic kidney disease (1)](https://info.ancsleep.com/blog/topic/chronic-kidney-disease)
- [climate and sleep (1)](https://info.ancsleep.com/blog/topic/climate-and-sleep)
- [cluster headache and sleep (1)](https://info.ancsleep.com/blog/topic/cluster-headache-and-sleep)
- [college students (1)](https://info.ancsleep.com/blog/topic/college-students)
- [cosleeping (1)](https://info.ancsleep.com/blog/topic/cosleeping)
- [cpap alternatives (1)](https://info.ancsleep.com/blog/topic/cpap-alternatives)
- [daytime fatigue (1)](https://info.ancsleep.com/blog/topic/daytime-fatigue)
- [decision-making and sleep (1)](https://info.ancsleep.com/blog/topic/decision-making-and-sleep)
- [desert sleep (1)](https://info.ancsleep.com/blog/topic/desert-sleep)
- [dialysis and fatigue (1)](https://info.ancsleep.com/blog/topic/dialysis-and-fatigue)
- [digestion and sleep (1)](https://info.ancsleep.com/blog/topic/digestion-and-sleep)
- [doomscrolling and sleep (1)](https://info.ancsleep.com/blog/topic/doomscrolling-and-sleep)
- [drowsy teen driving (1)](https://info.ancsleep.com/blog/topic/drowsy-teen-driving)
- [dry climate and sleep (1)](https://info.ancsleep.com/blog/topic/dry-climate-and-sleep)
- [eczema and sleep (1)](https://info.ancsleep.com/blog/topic/eczema-and-sleep)
- [epworth sleep scale (1)](https://info.ancsleep.com/blog/topic/epworth-sleep-scale)
- [essential oils (1)](https://info.ancsleep.com/blog/topic/essential-oils)
- [estrogen and sleep (1)](https://info.ancsleep.com/blog/topic/estrogen-and-sleep)
- [excessive daytime sleepiness (1)](https://info.ancsleep.com/blog/topic/excessive-daytime-sleepiness)
- [face shape and sleep (1)](https://info.ancsleep.com/blog/topic/face-shape-and-sleep)
- [family sleep health (1)](https://info.ancsleep.com/blog/topic/family-sleep-health)
- [fasting and sleep (1)](https://info.ancsleep.com/blog/topic/fasting-and-sleep)
- [fibroids and sleep (1)](https://info.ancsleep.com/blog/topic/fibroids-and-sleep)
- [fibromyalgia (1)](https://info.ancsleep.com/blog/topic/fibromyalgia)
- [fibromyalgia and sleep (1)](https://info.ancsleep.com/blog/topic/fibromyalgia-and-sleep)
- [focus (1)](https://info.ancsleep.com/blog/topic/focus)
- [focus and sleep (1)](https://info.ancsleep.com/blog/topic/focus-and-sleep)
- [glp1 and sleep (1)](https://info.ancsleep.com/blog/topic/glp1-and-sleep)
- [gout (1)](https://info.ancsleep.com/blog/topic/gout)
- [grief (1)](https://info.ancsleep.com/blog/topic/grief)
- [grief and sleep (1)](https://info.ancsleep.com/blog/topic/grief-and-sleep)
- [gut health and sleep (1)](https://info.ancsleep.com/blog/topic/gut-health-and-sleep)
- [heart failure (1)](https://info.ancsleep.com/blog/topic/heart-failure)
- [heart health and sleep (1)](https://info.ancsleep.com/blog/topic/heart-health-and-sleep)
- [herbal remedies for sleep (1)](https://info.ancsleep.com/blog/topic/herbal-remedies-for-sleep)
- [high blood pressure and sleep (1)](https://info.ancsleep.com/blog/topic/high-blood-pressure-and-sleep)
- [hot flashes and sleep (1)](https://info.ancsleep.com/blog/topic/hot-flashes-and-sleep)
- [hypervigilence and sleep (1)](https://info.ancsleep.com/blog/topic/hypervigilence-and-sleep)
- [hypoglycemia (1)](https://info.ancsleep.com/blog/topic/hypoglycemia)
- [inflammation (1)](https://info.ancsleep.com/blog/topic/inflammation)
- [irritable bowel syndrome (1)](https://info.ancsleep.com/blog/topic/irritable-bowel-syndrome)
- [late night (1)](https://info.ancsleep.com/blog/topic/late-night)
- [learning and sleep (1)](https://info.ancsleep.com/blog/topic/learning-and-sleep)
- [learning disabilities (1)](https://info.ancsleep.com/blog/topic/learning-disabilities)
- [leg swelling (1)](https://info.ancsleep.com/blog/topic/leg-swelling)
- [light therapy (1)](https://info.ancsleep.com/blog/topic/light-therapy)
- [liver disease (1)](https://info.ancsleep.com/blog/topic/liver-disease)
- [metabolic syndrome and sleep (1)](https://info.ancsleep.com/blog/topic/metabolic-syndrome-and-sleep)
- [microsleep (1)](https://info.ancsleep.com/blog/topic/microsleep)
- [middle age (1)](https://info.ancsleep.com/blog/topic/middle-age)
- [midnight awakenings (1)](https://info.ancsleep.com/blog/topic/midnight-awakenings)
- [migraine (1)](https://info.ancsleep.com/blog/topic/migraine)
- [morning fatigue (1)](https://info.ancsleep.com/blog/topic/morning-fatigue)
- [mouthguards and sleep (1)](https://info.ancsleep.com/blog/topic/mouthguards-and-sleep)
- [multiple sclerosis (1)](https://info.ancsleep.com/blog/topic/multiple-sclerosis)
- [muscle tension and sleep (1)](https://info.ancsleep.com/blog/topic/muscle-tension-and-sleep)
- [new mother sleep (1)](https://info.ancsleep.com/blog/topic/new-mother-sleep)
- [nicotine (1)](https://info.ancsleep.com/blog/topic/nicotine)
- [night owl (1)](https://info.ancsleep.com/blog/topic/night-owl)
- [night time cramps (1)](https://info.ancsleep.com/blog/topic/night-time-cramps)
- [nighttime affirmations (1)](https://info.ancsleep.com/blog/topic/nighttime-affirmations)
- [nighttime awakenings (1)](https://info.ancsleep.com/blog/topic/nighttime-awakenings)
- [nighttime hives (1)](https://info.ancsleep.com/blog/topic/nighttime-hives)
- [nighttime itching (1)](https://info.ancsleep.com/blog/topic/nighttime-itching)
- [nighttime rumination (1)](https://info.ancsleep.com/blog/topic/nighttime-rumination)
- [nighttime worry (1)](https://info.ancsleep.com/blog/topic/nighttime-worry)
- [ocd and sleep (1)](https://info.ancsleep.com/blog/topic/ocd-and-sleep)
- [outdoor sleep (1)](https://info.ancsleep.com/blog/topic/outdoor-sleep)
- [oxytocin and sleep (1)](https://info.ancsleep.com/blog/topic/oxytocin-and-sleep)
- [parent (1)](https://info.ancsleep.com/blog/topic/parent)
- [parenting (1)](https://info.ancsleep.com/blog/topic/parenting)
- [peripheral vascular disease and sleep (1)](https://info.ancsleep.com/blog/topic/peripheral-vascular-disease-and-sleep)
- [phones and sleep (1)](https://info.ancsleep.com/blog/topic/phones-and-sleep)
- [physical activity (1)](https://info.ancsleep.com/blog/topic/physical-activity)
- [pilates and sleep (1)](https://info.ancsleep.com/blog/topic/pilates-and-sleep)
- [plmd (1)](https://info.ancsleep.com/blog/topic/plmd)
- [poor sleep (1)](https://info.ancsleep.com/blog/topic/poor-sleep)
- [posture and sleep (1)](https://info.ancsleep.com/blog/topic/posture-and-sleep)
- [progesterone and sleep (1)](https://info.ancsleep.com/blog/topic/progesterone-and-sleep)
- [protein and sleep (1)](https://info.ancsleep.com/blog/topic/protein-and-sleep)
- [psych (1)](https://info.ancsleep.com/blog/topic/psych)
- [reading and sleep (1)](https://info.ancsleep.com/blog/topic/reading-and-sleep)
- [recovery and sleep (1)](https://info.ancsleep.com/blog/topic/recovery-and-sleep)
- [remote workers (1)](https://info.ancsleep.com/blog/topic/remote-workers)
- [reproductivity and sleep (1)](https://info.ancsleep.com/blog/topic/reproductivity-and-sleep)
- [retirement and sleep (1)](https://info.ancsleep.com/blog/topic/retirement-and-sleep)
- [revenge bedtime procrastination (1)](https://info.ancsleep.com/blog/topic/revenge-bedtime-procrastination)
- [school and sleep (1)](https://info.ancsleep.com/blog/topic/school-and-sleep)
- [sciatica and sleep (1)](https://info.ancsleep.com/blog/topic/sciatica-and-sleep)
- [sedentary lifestyle and sleep (1)](https://info.ancsleep.com/blog/topic/sedentary-lifestyle-and-sleep)
- [sids (1)](https://info.ancsleep.com/blog/topic/sids)
- [sjrogrens and sleep (1)](https://info.ancsleep.com/blog/topic/sjrogrens-and-sleep)
- [sleep and appetite (1)](https://info.ancsleep.com/blog/topic/sleep-and-appetite)
- [sleep and empathy (1)](https://info.ancsleep.com/blog/topic/sleep-and-empathy)
- [sleep and executive functioning (1)](https://info.ancsleep.com/blog/topic/sleep-and-executive-functioning)
- [sleep and mood (1)](https://info.ancsleep.com/blog/topic/sleep-and-mood)
- [sleep and outlook (1)](https://info.ancsleep.com/blog/topic/sleep-and-outlook)
- [sleep and self-perception (1)](https://info.ancsleep.com/blog/topic/sleep-and-self-perception)
- [sleep and stroke (1)](https://info.ancsleep.com/blog/topic/sleep-and-stroke)
- [sleep and temperature (1)](https://info.ancsleep.com/blog/topic/sleep-and-temperature)
- [sleep and trauma (1)](https://info.ancsleep.com/blog/topic/sleep-and-trauma)
- [sleep and work (1)](https://info.ancsleep.com/blog/topic/sleep-and-work)
- [sleep doctors (1)](https://info.ancsleep.com/blog/topic/sleep-doctors)
- [sleep drive (1)](https://info.ancsleep.com/blog/topic/sleep-drive)
- [sleep inertia (1)](https://info.ancsleep.com/blog/topic/sleep-inertia)
- [sleep influencers (1)](https://info.ancsleep.com/blog/topic/sleep-influencers)
- [sleep score (1)](https://info.ancsleep.com/blog/topic/sleep-score)
- [sleepwear (1)](https://info.ancsleep.com/blog/topic/sleepwear)
- [snacks (1)](https://info.ancsleep.com/blog/topic/snacks)
- [snooze (1)](https://info.ancsleep.com/blog/topic/snooze)
- [social media and sleep (1)](https://info.ancsleep.com/blog/topic/social-media-and-sleep)
- [somniphobia (1)](https://info.ancsleep.com/blog/topic/somniphobia)
- [stimulants and sleep (1)](https://info.ancsleep.com/blog/topic/stimulants-and-sleep)
- [substance abuse and sleep (1)](https://info.ancsleep.com/blog/topic/substance-abuse-and-sleep)
- [supplements (1)](https://info.ancsleep.com/blog/topic/supplements)
- [teeth grinding at night (1)](https://info.ancsleep.com/blog/topic/teeth-grinding-at-night)
- [tension headache and sleep (1)](https://info.ancsleep.com/blog/topic/tension-headache-and-sleep)
- [tmj and sleep (1)](https://info.ancsleep.com/blog/topic/tmj-and-sleep)
- [untreated sleep apnea (1)](https://info.ancsleep.com/blog/topic/untreated-sleep-apnea)
- [vaping and sleep (1)](https://info.ancsleep.com/blog/topic/vaping-and-sleep)
- [weight gain and sleep (1)](https://info.ancsleep.com/blog/topic/weight-gain-and-sleep)
- [weighted blanket and sleep (1)](https://info.ancsleep.com/blog/topic/weighted-blanket-and-sleep)
- [wfh (1)](https://info.ancsleep.com/blog/topic/wfh)
- [worry window (1)](https://info.ancsleep.com/blog/topic/worry-window)
- [yawn (1)](https://info.ancsleep.com/blog/topic/yawn)
- [yawning (1)](https://info.ancsleep.com/blog/topic/yawning)

[see all](https://info.ancsleep.com/blog/how-screen-time-impacts-childrens-sleep#)

**

### Anchorage

510 W. Tudor Rd., Ste 5,  
 Anchorage, AK 99503  
 E: info@ancsleep.com  
 P: (907) 743-0050  
 F: (907) 743-0060

**

### Wasilla

3719 E. Meridian Lp., Ste C,  
 Wasilla, AK 99654  
 E: info@wasillasleep.com  
 P: (907) 357-4200  
 F: (907) 357-4201

**

### Fairbanks

3405 Airport Way,  
 Fairbanks, AK 99709  
 E: info@fairbankssleep.com  
 P: (907) 374-9920  
 F: (907) 374-9930

**

### Juneau

8800 Glacier Hwy,Suite 215  
 Juneau, AK 99801  
 E: info@fairbankssleep.com  
 P: (907) 500-7368  
 F: (907) 500-7386

 © 2026 Anchorage Sleep Center, LLC. All Rights Reserved. Website by William Fraser Digital Creative